Daftar Harga Bahan Bangunan |
DAFTAR
HARGA DASAR SATUAN UPAH
No.
|
KODE
|
SAT
|
HARGA
|
KET
|
||
JAM
|
HARI
|
|||||
1.
|
Pekerja
|
(L01)
|
Jam
|
11.200,00
|
78.400,00
|
|
2.
|
Tukang
|
(L02)
|
Jam
|
12.700,00
|
88.900,00
|
|
3.
|
M
a n d o r
|
(L03)
|
Jam
|
13.200,00
|
92.400,00
|
|
4.
|
Operator
|
(L04)
|
Jam
|
13.700,00
|
95.900,00
|
|
5.
|
Pembantu
Operator
|
(L05)
|
Jam
|
11.200,00
|
78.400,00
|
|
6.
|
Sopir
/ Driver
|
(L06)
|
Jam
|
12.700,00
|
88.900,00
|
|
7.
|
Pembantu
Sopir / Driver
|
(L07)
|
Jam
|
11.200,00
|
78.400,00
|
|
8.
|
Mekanik
|
(L08)
|
Jam
|
13.700,00
|
95.900,00
|
|
9.
|
Pembantu
Mekanik
|
(L09)
|
Jam
|
11.200,00
|
78.400,00
|
|
10.
|
Kepala
Tukang
|
(L10)
|
Jam
|
15.200,00
|
106.400,00
|
|
DAFTAR
HARGA DASAR SATUAN BAHAN
No.
|
URAIAN
|
SAT
|
HARGA SATUAN
(Rp)
|
KET
|
||
Terendah
|
Tertinggi
|
|||||
1
|
Pasir
Pasang
|
M3
|
186.000
|
191.000
|
Lokasi
Pekerjaan
|
|
2
|
Pasir
Beton
|
M3
|
194.000
|
199.000
|
Lokasi
Pekerjaan
|
|
3
|
Pasir
Halus
|
M3
|
194.000
|
199.000
|
Lokasi
Pekerjaan
|
|
4
|
Pasir
Urug (ada unsur lempung)
|
M3
|
255.000
|
260.000
|
Lokasi
Pekerjaan
|
|
5
|
Batu
Kali / Batu Mangga
|
M3
|
395.000
|
400.000
|
Lokasi
Pekerjaan
|
|
6
|
Agregat
Pecah Kasar
|
M3
|
365.000
|
370.000
|
Base
Camp
|
|
7
|
Agg.
Halus LP A
|
M3
|
297.000
|
300.000
|
Base
Camp
|
|
8
|
Agregat
Lolos # 1 "
|
M3
|
347.000
|
350.000
|
Base
Camp
|
|
9
|
Lolos
screen1 ukuran ( 0 - 5)
|
M3
|
447.000
|
450.000
|
Base
Camp
|
|
10
|
Lolos
screen2 ukuran ( 0 - 5)
|
M3
|
417.000
|
420.000
|
Base
Camp
|
|
11
|
Lolos
screen2 ukuran ( 5 - 10)
|
M3
|
347.000
|
350.000
|
Base
Camp
|
|
12
|
Lolos
screen2 ukuran ( 10 - 20)
|
M3
|
322.150
|
325.150
|
Base
Camp
|
|
13
|
F
i l l e r
|
Kg
|
1.340
|
1.440
|
Proses/Base
Camp
|
|
14
|
Kerikil
|
M3
|
327.500
|
330.000
|
Lokasi
Pekerjaan
|
|
15
|
G
r a v e l
|
M3
|
327.500
|
330.000
|
Base
Camp
|
|
16
|
Bahan
Tanah Timbunan
|
M3
|
52.500
|
55.000
|
Borrow
Pit/quarry
|
|
17
|
Bahan
Pilihan
|
M3
|
17.500
|
20.000
|
Quarry
|
|
18
|
Aspal
|
KG
|
12.000
|
12.200
|
Base
Camp
|
|
19
|
Kerosen
/ Minyak Tanah
|
ltr
|
12.000
|
12.000
|
Base
Camp
|
|
20
|
Semen
/ PC (50kg)
|
Zak
|
60.000
|
72.000
|
Base
Camp
|
|
21
|
Besi
Beton
|
Kg
|
13.500
|
14.000
|
Lokasi
Pekerjaan
|
|
22
|
Kawat
Beton
|
Kg
|
16.500
|
18.000
|
Lokasi
Pekerjaan
|
|
23
|
Kawat
Bronjong
|
Kg
|
9.650
|
10.000
|
Lokasi
Pekerjaan
|
|
24
|
S
i r t u
|
M3
|
195.500
|
200.000
|
Lokasi
Pekerjaan
|
|
25
|
Cat
Marka (Non Thermoplas)
|
Kg
|
59.000
|
59.200
|
Lokasi
Pekerjaan
|
|
26
|
Cat
Marka (Thermoplastic)
|
Kg
|
64.000
|
64.200
|
Lokasi
Pekerjaan
|
|
27
|
P
a k u
|
Kg
|
16.500
|
20.000
|
Lokasi
Pekerjaan
|
|
28
|
Kayu
Perancah
|
M3
|
1.775.000
|
1.800.000
|
Lokasi
Pekerjaan
|
|
29
|
B
e n s i n
|
ltr
|
8.000
|
9.500
|
Base
Camp
|
|
30
|
S
o l a r
|
ltr
|
8.500
|
10.000
|
Base
Camp
|
|
31
|
Minyak
Pelumas / Olie
|
ltr
|
28.000
|
30.000
|
Base
Camp
|
|
32
|
Plastik
Filter
|
M2
|
12.500
|
15.000
|
Lokasi
Pekerjaan
|
|
33
|
Pipa
Galvanis Dia. 1.6"
|
Btng
|
150.500
|
154.000
|
Lokasi
Pekerjaan
|
|
34
|
Pipa
Porus
|
M'
|
39.800
|
40.000
|
Lokasi
Pekerjaan
|
|
35
|
Agr.
Base Kelas A
|
M3
|
382.033
|
384.533
|
Base
Camp
|
|
36
|
Agr.
Base Kelas B
|
M3
|
364.429
|
366.929
|
Base
Camp
|
|
37
|
Agr.
Base Kelas C
|
M3
|
247.500
|
250.000
|
Base
Camp
|
|
38
|
Geotextile
|
M2
|
32.500
|
35.000
|
Lokasi
Pekerjaan
|
|
39
|
Aspal
Emulsi
|
Kg
|
4.800
|
5.000
|
Base
Camp
|
|
40
|
Gebalan
Rumput
|
M2
|
3.300
|
3.500
|
Lokasi
Pekerjaan
|
|
41
|
Thinner
|
ltr
|
11.800
|
12.000
|
Lokasi
Pekerjaan
|
|
42
|
Glass
Bead
|
Kg
|
26.600
|
28.600
|
Lokasi
Pekerjaan
|
|
43
|
Pelat
Rambu (Eng. Grade)
|
BH
|
174.000
|
176.000
|
Lokasi
Pekerjaan
|
|
44
|
Pelat
Rambu (High I. Grade)
|
BH
|
214.500
|
216.500
|
Lokasi
Pekerjaan
|
|
45
|
Rel
Pengaman
|
M'
|
410.500
|
412.500
|
Lokasi
Pekerjaan
|
|
46
|
Beton
K-250
|
M3
|
983.000
|
985.000
|
Lokasi
Pekerjaan
|
|
47
|
Baja
Tulangan (Polos) U24
|
Kg
|
14.550
|
15.000
|
Lokasi
Pekerjaan
|
|
48
|
Baja
Tulangan (Ulir) D32
|
Kg
|
15.550
|
16.000
|
Lokasi
Pekerjaan
|
|
49
|
Kapur
|
M3
|
39.550
|
40.000
|
Hasil
Proses
|
|
50
|
Chipping
|
M3
|
34.550
|
35.000
|
Base
Camp
|
|
51
|
Chipping
(kg)
|
Kg
|
3.050
|
3.500
|
Base
Camp
|
|
52
|
Cat
|
Kg
|
54.550
|
55.000
|
Base
Camp
|
|
53
|
Pemantul
Cahaya (Reflector)
|
Bh.
|
64.550
|
65.000
|
Base
Camp
|
|
54
|
Pasir
Urug
|
M3
|
190.550
|
191.000
|
Base
Camp
|
|
55
|
Arbocell
|
Kg.
|
31.550
|
32.000
|
Base
Camp
|
|
56
|
Baja
Bergelombang
|
Kg
|
12.050
|
12.500
|
Lokasi
Pekerjaan
|
|
57
|
Beton
K-125
|
M3
|
748.000
|
750.000
|
Lokasi
Pekerjaan
|
|
58
|
Baja
Struktur
|
Kg
|
180.000
|
181.500
|
Pelabuhan
terdekat
|
|
59
|
Tiang
Pancang Baja
|
M'
|
24.997
|
25.247
|
Lokasi
Pekerjaan
|
|
60
|
Tiang
Pancang Beton Pratekan
|
M3
|
423.708
|
423.958
|
Pelabuhan
terdekat
|
|
61
|
Kawat
Las
|
Dos
|
15.750
|
16.000
|
Lokasi
Pekerjaan
|
|
62
|
Pipa
Baja
|
Kg
|
14.750
|
15.000
|
Pelabuhan
terdekat
|
|
63
|
Minyak
Fluks
|
ltr
|
5.987
|
6.237
|
Base
Camp
|
|
64
|
Bunker
Oil
|
ltr
|
2.750
|
3.000
|
Base
Camp
|
|
65
|
Asbuton
Halus
|
Ton
|
323.500
|
325.000
|
Base
Camp
|
|
66
|
Baja
Prategang
|
Kg
|
7.800
|
8.000
|
Base
Camp
|
|
67
|
Baja
Tulangan (Polos) U32
|
Kg
|
12.800
|
13.000
|
Lokasi
Pekerjaan
|
|
68
|
Baja
Tulangan (Ulir) D39
|
Kg
|
15.800
|
16.000
|
Lokasi
Pekerjaan
|
|
69
|
Baja
Tulangan (Ulir) D48
|
Kg
|
8.800
|
9.000
|
Lokasi
Pekerjaan
|
|
70
|
PCI
Girder L=17m
|
Bh
|
85.997.500
|
86.000.000
|
Pelabuhan
terdekat
|
|
71
|
PCI
Girder L=21m
|
Bh
|
96.997.500
|
97.000.000
|
Pelabuhan
terdekat
|
|
72
|
PCI
Girder L=26m
|
Bh
|
123.997.500
|
124.000.000
|
Pelabuhan
terdekat
|
|
73
|
PCI
Girder L=32m
|
Bh
|
156.997.500
|
157.000.000
|
Pelabuhan
terdekat
|
|
74
|
PCI
Girder L=36m
|
Bh
|
167.997.500
|
168.000.000
|
Pelabuhan
terdekat
|
|
75
|
PCI
Girder L=41m
|
Bh
|
191.997.500
|
192.000.000
|
Pelabuhan
terdekat
|
|
76
|
Beton
K-300
|
M3
|
1.350.500
|
1.354.000
|
Lokasi
Pekerjaan
|
|
77
|
Beton
K-175
|
M3
|
986.500
|
990.000
|
Lokasi
Pekerjaan
|
|
78
|
Cerucuk
|
M
|
15.650
|
16.000
|
||
79
|
Elastomer
|
bh
|
297.500
|
300.000
|
||
80
|
Bahan
pengawet: kreosot
|
ltr
|
4.750
|
5.000
|
||
81
|
Mata
Kucing
|
bh
|
74.750
|
75.000
|
||
82
|
Anchorage
|
bh
|
476.500
|
480.000
|
||
83
|
Anti
strpping agent
|
Kg
|
20.500
|
24.000
|
||
84
|
Bahan
Modifikasi
|
Kg
|
900
|
1.000
|
||
85
|
Ducting
(Kabel prestress)
|
M'
|
146.500
|
150.000
|
||
86
|
Ducting
(Strand prestress)
|
M'
|
48.600
|
50.000
|
||
87
|
Multipleks
12 mm
|
Lbr
|
180.000
|
181.500
|
||
88
|
Elastomer
jenis 1
|
bh
|
384.000
|
385.500
|
Base
Camp
|
|
89
|
Elastomer
jenis 2
|
bh
|
648.500
|
650.000
|
Base
Camp
|
|
90
|
Elastomer
jenis 3
|
bh
|
836.500
|
838.000
|
Base
Camp
|
|
91
|
Expansion
Tipe Joint Asphaltic Plug
|
M
|
998.500
|
1.000.000
|
Base
Camp
|
|
92
|
Expansion
Join Tipe Rubber
|
M
|
1.198.500
|
1.200.000
|
Base
Camp
|
|
93
|
Expansion
Join Baja Siku
|
M
|
273.500
|
275.000
|
Base
Camp
|
|
94
|
Marmer
|
Bh
|
398.500
|
400.000
|
Base
Camp
|
|
95
|
Kerb
Type A
|
Bh
|
43.500
|
45.000
|
Base
Camp
|
|
96
|
Paving
Block
|
Bh
|
38.500
|
40.000
|
Lokasi
Pekerjaan
|
|
97
|
Mini
Timber Pile
|
Bh
|
25.500
|
27.000
|
Lokasi
Pekerjaan
|
|
98
|
Expansion
Joint Tipe Torma
|
M1
|
1.198.500
|
1.200.000
|
Lokasi
Pekerjaan
|
|
99
|
Strip
Bearing
|
Bh
|
228.000
|
229.500
|
Lokasi
Pekerjaan
|
|
100
|
Joint
Socket Pile 35x35
|
Set
|
606.000
|
607.500
|
Lokasi
Pekerjaan
|
|
101
|
Joint
Socket Pile 16x16x16
|
Set
|
66.000
|
67.500
|
Lokasi
Pekerjaan
|
|
102
|
Mikro
Pile 16x16x16
|
M1
|
59.250
|
60.750
|
Lokasi
Pekerjaan
|
|
103
|
Matras
Concrete
|
Bh
|
403.500
|
405.000
|
Lokasi
Pekerjaan
|
|
104
|
Assetilline
|
Btl
|
228.000
|
229.500
|
Lokasi
Pekerjaan
|
|
105
|
Oxygen
|
Btl
|
113.250
|
114.750
|
Lokasi
Pekerjaan
|
|
106
|
Batu
Bara
|
Kg
|
550
|
600
|
Lokasi
Pekerjaan
|
|
107
|
Pipa
Galvanis Dia 3"
|
M
|
98.500
|
100.000
|
Lokasi
Pekerjaan
|
|
108
|
Pipa
Galvanis Dia 1,5"
|
M
|
65.500
|
67.000
|
Lokasi
Pekerjaan
|
|
109
|
Agregat
Pecah Mesin 0-5 mm
|
M3
|
448.500
|
450.000
|
Lokasi
Pekerjaan
|
|
110
|
Agregat
Pecah Mesin 5-10 mm
|
M3
|
348.500
|
350.000
|
Lokasi
Pekerjaan
|
|
111
|
Agregat
Pecah Mesin 10-20 mm
|
M3
|
348.500
|
350.000
|
Lokasi
Pekerjaan
|
|
112
|
Agregat
Pecah Mesin 20-30 mm
|
M3
|
323.650
|
325.150
|
Lokasi
Pekerjaan
|
|
113
|
Joint
Sealent
|
ltr
|
32.600
|
34.100
|
Lokasi
Pekerjaan
|
|
114
|
Cat
Anti Karat
|
ltr
|
34.250
|
35.750
|
Lokasi
Pekerjaan
|
|
115
|
Expansion
Cap
|
bh
|
4.550
|
6.050
|
Lokasi
Pekerjaan
|
|
116
|
Polytene
125 mikron
|
m2
|
17.750
|
19.250
|
Lokasi
Pekerjaan
|
|
117
|
Curing
Compound
|
ltr
|
37.000
|
38.500
|
Lokasi
Pekerjaan
|
|
118
|
Kayu
Acuan
|
m3
|
96.998.500
|
97.000.000
|
Lokasi
Pekerjaan
|
|
119
|
Tripleks
|
Lbr
|
118.500
|
120.000
|
Lokasi
Pekerjaan
|
|
120
|
Additive
|
ltr
|
37.000
|
38.500
|
Lokasi
Pekerjaan
|
|